Creston Overlay
Project Scope:
• 0.15’ asphalt mill and overlay from reference post (RP) 33.2 to 40.3, to the widths as outlined in the plans. 11 public approaches will receive a 0.15’ asphalt mill and overlay to the radius returns.
• Crack seal from RP 33.2 to 40.3 on the outer 6’ of shoulders.
• Seal and cover and fog seal the existing pavement full width from RP 33.2 to 40.3.
• Other work will include signing and delineation upgrades, electrical upgrades to the MT-35 and MT-83 intersection, new pavement markings, and shoulder and centerline rumble strips.
The project begins at RP 33.2 (about 0.4 miles south of the Swan Highway (MT-83) junction) and extends northerly 7.1 miles along MT-35 (P-52) to RP 40.3 (about 1.2 miles southeast of the Town of Creston).