LHC Construction Services
Having served the Flathead Valley for over 50 years our company has helped shape the landscape of this beautiful area. We are proud to have helped engineer and develop bridges, overpasses, highway systems and building projects for our community.
Excavation
LHC, Inc. has specialized in mass excavation and infrastructure installation on dozens of high profile municipal and Montana Department of Transportation projects throughout Montana ranging from $50 thousand to nearly $34 million with the recent award of the Kalispell Bypass project. Our heavy equipment fleet is capable of moving large volumes of materials in high production fashion, while utilizing the latest GPS technology which insures precision results.
Construction
LHC's construction division is capable of completing almost any project. We employ highly qualified individuals allowing us to provide competitive prices and expedited completion schedules on a routine basis. As part of our construction division, we offer the following services: water/sewer line installation, mass excavation and road building. Those services, in conjunction with our asphalt paving department, gravel department and concrete department, allows us greater flexibility and minimizes your need to outsource.
These are some of the many projects we are working on or have had the benefit of participating in.
- Kalispell Bypass - $33 Million
- Glacier Rail Park - $11.2 Million
- Browning West - $11 Million
- Whitefish West - $8.2 Million
- Cut Bank Overpass - $6.3 Million
- KalispellWest Reconstruct - $5.2 Million
- Three Mile Drive - Kalispell - $5.0 Million
- Seeley Lake North - $4 million
- JCT US 2 North of Chester - $3.6 Million
- 11th11th Ave Havre - $3.4 Million
- Reserve Street South - $3 Million
- 4th Ave, East - $2.5 Million
- Anaconda Sewer - $1.8 Million
- Kalisepll Ford - $1.3 Million
- Kidsports Addition Infrastructure Improvements - $1.1 Million
Asphalt and Paving
LHC began producing asphalt in 1999 and has since become a leading asphalt producer and paving contractor in the Flathead Valley. We use a state of the art counter flow drum mix plant to produce our asphalt. The counter flow technology allows us to incorporate recycled asphalt into our mix instead of taking it to a landfill or wasting it. Asphalt is the most recycled product in the world and we want to do out part to facilitate a greener tomorrow.
Rock and Gravel
LHC, Inc. currently services the Flathead Valley utilizing three strategically located gravel pits; Coverdell in Bigfork, West Valley pit off Church Drive and the Stillwater pit on Stillwater Road. These pits supply a wide variety of materials from washed and screened rock, crushed road base gravels, chips and bank sand to pit run. Gravel from these pits is used in our asphalt production and is available to the public. We also carry recycled concrete and asphalt products.
All of our pits are equipped with scales which return the data to our head office on Stillwater Road. Our summer hours are from 8:00 A.M. to 5:00 P.M. Monday through Friday, please call ahead for Saturday hours. Fall, Winter, and Spring hours are based on the weather and customer volume please call ahead during these times as well. (406)758-6419.
Concrete Mixing
LHC began selling ready mixed concrete in 2002. We strive to provide the best product, the best price and the best service everyday. As a member of the National Ready Mixed Concrete Association (NRMCA) our plant and our drivers receive additional training to ensure a quality product.
Call our direct concrete line (406) 758-6433 to place your order.
These are some of the many projects we are working on or have had the benefit of participating in.
- U.S. Highway 93 Bypass - Bridges, Curb & Sidewalk
- Kalispell Ford Dealership
- West Valley School Gymnasium Addition
- U.S. Highway 2 - Bridges
- U.S. Highway 2 - Highway Paving
- Digestive Health Center
- KalispellRegional Medical Center
- Southside Elementary
- Walmart Supercenter
- Cinemark Signature Theatres